Immediately following a storm that flooded Pleasants Creek and caused severe damage to an existing concrete pile extension at one of the bents, MGE was retained by the County to design repairs to the damaged bridge support. Following completion of an accelerated PS&E package, the County had the repairs made and was able to re-open the bridge to traffic in a matter of several weeks.
Client: County of Solano Department of Resource Management
Key Staff:
Project Engineer: Bob Sennett