As part of the design team working on the Caltrans Interstate 5 North Stockton Improvement Project, MGE completed the design and PS&E for the median widening of the bridges crossing Country Club Boulevard and Benjamin Holt Drive. Both of these bridges consist of cast-in-place, single-span, prestressed concrete box girder superstructures supported on driven piles.
Client: Biggs Cardosa Associates Inc.
Key Facts:
- Construction is expected to be completed in 2015
Project Manager/Bridge Project Engineer: Bob Sennett