Winters Road Bridge Replacement at Putah Creek The construction of this $12 million project was completed in November of 2015. This Bridge Replacement project, a joint effort between Solano County and the City of Winters, consisted of the replacement of
Bridge Replacement / Rehabilitation
Camp 2 Bridge Replacement
This project is located in El Dorado County, south of U.S. Highway 50 near the town of Riverton, CA. The project consisted of the replacement of an existing structurally deficient timber bridge that provides the only vehicle access to the
Country Club Boulevard U.C. and Benjamin Holt Drive U.C. Bridge Widenings
As part of the design team working on the Caltrans Interstate 5 North Stockton Improvement Project, MGE completed the design and PS&E for the median widening of the bridges crossing Country Club Boulevard and Benjamin Holt Drive. Both of these
Brushy Creek Bridge Widenings on Vasco Road
Under an “On-Call” contract with the County, MGE completed the design, independent design check, and prepared the PS&E for the widening of two bridges crossing Brushy Creek on Vasco Road. Both bridges were widened to provide for two 12-foot travel
Sierra Buttes Road Bridge Replacement at Reis Ravine
MGE assisted the County in obtaining HBP funding for the project, completed the preliminary engineering, coordinated the completion of environmental studies, organized community involvement activities, prepared permit applications, interfaced with the Forest Service and Caltrans, coordinated right-of-way surveys, prepared legal
Big Chico Creek Bridge and Lindo Channel Bridge Widenings
As part of the Manzanita Corridor project within the City of Chico, MGE completed the design and PS&E for the widening of the bridges crossing Big Chico Creek and Lindo Channel. Both bridges are cast-in-place, multi-span, reinforced concrete slab superstructures
Goodyears Creek Road Bridge at Goodyears Creek
MGE assisted the County in obtaining HBP funding for the project, completed the preliminary engineering, coordinated the completion of environmental studies, organized community involvement activities, prepared permit applications, interfaced with the Forest Service and Caltrans, prepared the PS&E for the
Cordelia Road Bridge Replacement at Suisun Creek
MGE completed the bridge and approach roadway design and PS&E for this HBP-funded project. The replacement bridge consisted of a three-span, cast-in-place, post-tensioned concrete slab superstructure supported on concrete pier walls and driven concrete piles. The project included the design
Cache Creek Replacement on County Road 57 at Guinda
MGE completed the bridge and roadway design and PS&E for this HBP funded project for the County of Yolo Planning and Public Works Department. The project consisted of constructing a replacement bridge and approach roadways on a new alignment adjacent
Burger Creek Bridge Rehabilitation
This historic bridge, which is featured in the publication “Historic Highway Bridges of California”, is an iron Whipple deck truss bridge constructed in 1885 and relocated to Mendocino County in 1934. As part of the engineering for the project, MGE