MGE performed a detailed inspection and completed a load rating analysis of this three-span, cast-in-place, reinforced concrete “T”-Girder bridge with varying depth girders and cantilever end spans located within the Modoc National Forest at the request of the USDA Forest Service, after cracking of one of the two superstructure girders was discovered. A detailed report was prepared summarizing the findings and recommendations for repair work and load limit posting.
Client: USDA Forest Service
Key Staff:
Project Engineer/Inspector: Bob Sennett