MGE performed two fracture critical inspections of this 534-foot, three-span, steel plate girder structure crossing the Rubicon River on Eleven Pines Road within the Eldorado National Forest. In addition to preparing the fracture critical inspection reports, MGE also completing the bridge load rating and conducted destructive and non-destructive testing of portions of the steel members in order to asses minor cracking that was discovered during inspections.
Client: USDA Forest Service
Key Staff:
Project Manager/Bridge Project Engineer: Bob Sennett